Recent results from the Louvain-la-Neuve RIB-facility

Ryckewaert, Guido;Colson, JM;Gaelens, M.;Loiselet, Marc;Postiau, Nancy
(2002) 5th International Conference on Radioactive Nuclear Beams — Location: DIVONNE(France) (27.March.2000)

Files

No attached file found for this publication.

Details

Authors
  • Ryckewaert, GuidoUCLouvain
    Author
  • Colson, JM
    Author
  • Gaelens, M.
    Author
  • Loiselet, MarcUCLouvain
    Author
  • Author
Abstract
At the end of 1999, a first on-line RIB was accelerated, extracted and separated with the new cyclotron, CYCLONE44. An efficiency of 7% (from ion source exit to experiment target), resulting in 6 x 10(8) pps of Ne-19(3+), was obtained. Up to 9 kW of beam power has been put on the LiF target giving increased intensities for He-6, Ne-18 and O-15. A new accelerated and pure Be-7-beam of 2 x 107 pps has been produced, using the sputteting electrode in the ECR-source. Production tests of 140 using CYCLONE110 have started in view of their acceleration with CYCLONE44. (C) 2002 Elsevier Science B.V. All rights reserved.
Affiliations

Citations

Ryckewaert, G., Colson, J., Gaelens, M., Loiselet, M., & Postiau, N. (2002). Recent results from the Louvain-la-Neuve RIB-facility. Nuclear Physics, Section A, 701, 323C-326C. https://hdl.handle.net/2078.5/43252 (Original work published 2002)