Forecasting a long memory process subject to structural breaks

Wang, Cindy Shin-Huei;Bauwens, Luc;Hsiao, Cheng
(2013) Journal of Econometrics — Vol. 177, n° 2, p. 171-184 (2013)

Files

Rep2574.pdf
  • Closed Access
  • Adobe PDF
  • 740 KB

Details

Authors
  • Wang, Cindy Shin-HueiNational Tsing Hua University
    Author
  • Bauwens, Lucorcid-logoUCLouvain
    Author
  • Hsiao, ChengUniversity of Southern California and Hong Kong University of Science an Technology
    Author
Abstract
We develop an easy-to-implement method for forecasting a stationary autoregressive fractionally integrated moving average (ARFIMA) process subject to structural breaks with unknown break dates. We show that an ARFIMA process subject to a mean shift and a change in the long memory parameter can be well approximated by an autoregressive (AR) model and suggest using an information criterion (AIC or Mallows' C_p) to choose the order of the approximate AR model. Our methods avoids the issue of estimation inaccuracy of the long memory parameter and the issue of spurious breaks in finite sample. Insights from our theoretical analysis are confirmed by Monte Carlo experiments, through which we also find that our method provides a substantial improvement over existing prediction methods. An empirical application to the realized volatility of three exchange rates illustrates the usefulness of our forecasting procedure. The empirical success of the HAR-RV model can be explained, from an econometric perspective, by our theoretical and simulation results.
Affiliations

Citations

Wang, C. S.-H., Bauwens, L., & Hsiao, C. (2013). Forecasting a long memory process subject to structural breaks. Journal of Econometrics, 177(2), 171-184. https://doi.org/10.1016/j.jeconom.2013.04.006 (Original work published 2013)